100 Plus Excavators Dismantle a Bridge in east China Overnight
The job began at around 22:30 and the main body of the bridge was dismantled overnight.
Thanks to the optimization of plan, the traffic was not affected.
Residents praised the demolition as “highly efficient”. More on: http://www.cctvplus.com/news/20160828…